The last time i went out on mendip it had a jp2 fitted that was before they did the restoration work a few years back as far as i know still has this engine fitted.

http://www.nationalhistoricships.org.uk/register/480/mendip

 

says FR2 and we discussed the engine just after the restoration here

 

http://www.canalworld.net/forums/index.php?showtopic=39255

 

with no mention of a JP2.

 

MP.

Link to comment
Share on other sites

http://www.nationalhistoricships.org.uk/register/480/mendip

 

says FR2 and we discussed the engine just after the restoration here

 

http://www.canalworld.net/forums/index.php?showtopic=39255

 

with no mention of a JP2.

 

MP.

My bad, i always thought was a jp2 have to admit didnt pay much attention i just started the thing.

Link to comment
Share on other sites

 

We have a JP3M dated 1957. Can't be the original as the boat was built in '53 though, so it may have been specially ordered from Lister as a replacement after some mishap.

As far as I am aware, JP2s ceased production 1952/53 but the JP3s went on being made for longer, possibly even into the early 60s.

Link to comment
Share on other sites

As far as I am aware, JP2s ceased production 1952/53 but the JP3s went on being made for longer, possibly even into the early 60s.

 

The official end of production for both JP2 and 3 was 1952 according to the paperwork however that doesnt mean they stopped building new ones. They just stopped mass producing them. I have had more than one JP3 come through the workshop with matching flywheel, crank and crankcase serial numbers dating them at the late 50's. Maybe replacements for engines that have failed, wore out for an long running customer etc etc.

Link to comment
Share on other sites

 

The official end of production for both JP2 and 3 was 1952 according to the paperwork however that doesnt mean they stopped building new ones. They just stopped mass producing them. I have had more than one JP3 come through the workshop with matching flywheel, crank and crankcase serial numbers dating them at the late 50's. Maybe replacements for engines that have failed, wore out for an long running customer etc etc.

...just as the official end of production for Gardner LWs was about 1973, but there are examples around built in the 1990s (I think that the very last 2LW was outshopped in 2000). After all, if a customer is waving money about and you've got the parts, moulds etc. in stock, it would be silly to turn him away.

Link to comment
Share on other sites

...just as the official end of production for Gardner LWs was about 1973, but there are examples around built in the 1990s (I think that the very last 2LW was outshopped in 2000). After all, if a customer is waving money about and you've got the parts, moulds etc. in stock, it would be silly to turn him away.

Seem to remember a batch of 2LW's were built in the mid 90's to service an order to replace worn out ones in South African mining loco's. A few UK orders were tagged onto this. Remember viewing a 1995 high spec nb built with a new one.

 

Marine Dorman 4DSM and gearbox - 20hp @ 1000rpm

 

s-l1600.jpg

Link to comment
Share on other sites

Seem to remember a batch of 2LW's were built in the mid 90's to service an order to replace worn out ones in South African mining loco's. A few UK orders were tagged onto this. Remember viewing a 1995 high spec nb built with a new one.

 

 

 

s-l1600.jpg

I heard that story too, but I have also heard that there never was a S. African order. Who knows?

I too have seen a n/b with one of the "new" engines; I may have got this wrong, but I think there was a plaque in the engine room stating that this was the last 2LW built.

Link to comment
Share on other sites

I heard that story too, but I have also heard that there never was a S. African order. Who knows?

I too have seen a n/b with one of the "new" engines; I may have got this wrong, but I think there was a plaque in the engine room stating that this was the last 2LW built.

 

There wasn't an order, although there was a serious enquiry from the mines in South Africa for new engines. Sadly it couldn't be done to the delivery date and quantities required so the locos were refitted with Chinese made clones of Dorman engines (marketed as Riccardos).

 

The South Africans were still managing to get hold of new 2LWs during the UN embargo back in the loathsome apartheid era. We recently had a South African 2LW come through the workshop which dated from the sanctions period. A country who managed to smuggle enough nuclear material to build a working nuclear power station and, allegedly, an atomic bomb would find engine smuggling a breeze. Psssst , wanna buy a Gardner ?ninja.gif

Link to comment
Share on other sites

  • 2 weeks later...
  • 2 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.