front and rear bulkheads are tacked in place ,rear self draining deck is tacked in and then all fully welded ,front deck is cut to shape and all fully welded
Website Name: Darke
Website URL: http://www.darkegroup.co.uk/
Any other comments: See images below:
floor plate layed rear swim and floor angle tacked in place.mailto:stan@darkesteelboats.co.uk.
side sheets are pressed stood in place braced and squared .
stern is rolled ,diesel tank welded into place die pended and presure tested weed hatch hole cut and weedhatch welded into place
Thanks for your kind words.
You are right this is nothing to do with Floating Homes. The reference on the web address is because Darke Group always owned the Floating Homes web site. The Darke Group parted company with Floating Homes in April 2008.
From experience Darke Steel will not be doing any boat fit outs and I will not let any boat leave the workshop until the boat is complete and accepted by the customer.
We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.