Jump to content

Davestampy1

Member
  • Posts

    52
  • Joined

  • Last visited

Profile Information

  • Gender
    Male
  • Location
    Surrey
  • Interests
    Fishing and boating and being by water...
  • Occupation
    Carpenter
  • Boat Name
    Maria
  • Boat Location
    Hampton court

Recent Profile Visitors

888 profile views

Davestampy1's Achievements

Engager

Engager (3/12)

2

Reputation

  1. Hi Weve put a small deposit on a build slot and jist wondering whos used him lately and any reviews would be great tia....
  2. Kitchen finally almost finished jist some painting. Made a staircase that has storage from top step and drawer on the bottom. Tiled back of bathroom wall... almost there now jist some trims on joins fix hatch and paint throughout...
  3. he has two beds first being hes main. which also houses our tank and draw at the front and a comparment at the back. second his back up ... thanks phill kept meaning to. next jobs will be worktops in kitchen and flooring. we are proberly going to get click vynal flooring...
  4. sorry its been a while. here is my logburner we completed today. kitchen in roughly apart from maybe moving the island to the other side better walk way then. and worktops...
  5. Thanks. Not too sure got it on ebay. Only thing is the hieght it's fine for me but not for taller people so I'm going to sink it into the cieling and silly me put the extractor right behind it so I'll have to move it out of shower area.
  6. Just been doing our bathroom slowly. Whale gulper pump made the vanity unit up. Next is waney edge oak top towel rail shower screen and some kind of timber cladding on window wall and a door then onto next project....
  7. Haha nice comment. She's been painting I've been wiring up spotlights... next to run pipe work and cables under gunnels for kitchen ect... need to think about hot water and I'm open to suggestions. We will have a webasto and rads running down one side of boat...
  8. All side now done. Priming the ceiling. Me with a grim on my face happy to see the end of the plying.
  9. Little bit more today. Takes ages as every panel needs scribing into the cieling ect. This wall has a nice curve in it that you can't really see in the picture. We strung a line to keep it straight...
  10. Thanks it will be slanted. That was just one profile and set up another slanted one but no picture of it looks much better. It will also house pipework and socket cables.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.